Mercury Jupiter 2

Spacecraft:
(no serial number)
Launch Vehicle:
Jupiter MJ-2
Scheduled Launch:
1 Feb 1960
Last Scheduled:
21 Mar 1959


Prime
Crew

⇑ Mission List ⇑

Designation: Mercury J S(U)-2
Description: 1st Mercury Jupiter unmanned suborbital

not assigned
Backup
Crew

not assigned

In the January 1959 Mercury program plan, flights of the capsule on a Jupiter IRBM were to take place in addition to flights atop the Redstone and Atlas boosters. The second Mercury-Jupiter flight was planned as a maximum dynamic pressure test to qualify a production Mercury capsule with a chimpanzee aboard. The Mercury-Jupiter flights were cancelled in July 1959 on cost grounds.

The program insignia shown above is post factum.

References:
Grimwood, James M. 1963. Project Mercury: A Chronology. NASA SP-4001.
Encyclopedia Astronautica.
Wikipedia.