Horizon 22

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Feb 1965
Last Scheduled:
9 Jun 1959


Prime
Crew

⇑ Mission List ⇑

Designation: Horizon 1 O-LS-1
Description: 1st Horizon Saturn I manned support orbital for 1st manned lunar landing

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

Horizon 23

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
5 Feb 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-1
Description: 1st Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 24

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
8 Feb 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-2
Description: 2nd Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 25

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
13 Feb 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-3
Description: 3rd Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 26

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn II
Scheduled Launch:
8 Feb 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 2 O-LS(U)-1-1
Description: 1st Horizon Saturn II unmanned support orbital for 1st manned lunar landing

Horizon 27

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
21 Feb 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-EV(U)-2
Description: 2nd Horizon Saturn I unmanned emergency vehicle orbital

Horizon 29

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Mar 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-4
Description: 4th Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 30

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
7 Mar 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-5
Description: 5th Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 31

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
13 Mar 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-6
Description: 6th Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 32

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn II
Scheduled Launch:
20 Mar 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 2 O-LS(U)-1-2
Description: 2nd Horizon Saturn II unmanned support orbital for 1st manned lunar landing

Horizon 34

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Apr 1965
Last Scheduled:
9 Jun 1959


Prime
Crew

⇑ Mission List ⇑

Designation: Horizon 1 G-1
Description: 1st Horizon Saturn I manned lunar landing

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

Horizon 35

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
7 Apr 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-7
Description: 7th Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 36

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
13 Apr 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-LS(U)-1-8
Description: 8th Horizon Saturn I unmanned support orbital for 1st manned lunar landing

Horizon 37

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn II
Scheduled Launch:
19 Apr 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 2 O-LS(U)-1-3
Description: 3rd Horizon Saturn II unmanned support orbital for 1st manned lunar landing

Horizon was a 1959 US Army study to establish a military lunar outpost. According to the project plan, by the end of 1964, a total of 40 Saturn vehicles would have been launched to assemble the necessary spacecraft and infrastructure in low earth orbit. Cargo delivery to the moon would begin in January 1965 with the first manned landing by two men in April 1965. The build-up and construction phase continued until the outpost would be manned by a task force of 12 men in November 1966.

This build-up program required 61 Saturn I (not to be confused with the Saturn C-1, which was later redesignated as the Saturn I) and 88 Saturn II launchings through November 1966. Some 490,000 pounds of useful cargo would be transported to the moon. During 1967, the first operational year of the lunar outpost, a total of 64 launchings were scheduled, resulting in an additional 266,000 pounds of cargo on the moon. The total cost of the eight and one-half year program presented in the study was estimated to be six billion dollars.

Soon after the Horizon study was completed, NASA was formed and assigned all space exploration tasks. The Von Braun team that led Horizon were transferred to NASA. The origins of the Apollo project can be seen in Horizon.

The Horizon Orbital Return Vehicle was envisioned to carry 10 to 16 men.

References:
Encyclopedia Astronautica.
Wikipedia.