Horizon 1

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Aug 1964
Last Scheduled:
9 Jun 1959


Prime
Crew

⇑ Mission List ⇑

Designation: Horizon 1 O-CA-1-1
Description: 1st Horizon Saturn I manned support orbital of 1st assembled cargo lunar landing

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

Horizon 2

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
2 Aug 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-1
Description: 1st Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 3

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Sep 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-2
Description: 2nd Horizon Saturn I manned support orbital of 1st assembled cargo lunar landing

Horizon 4

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
11 Sep 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-3
Description: 3rd Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 5

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
21 Sep 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-4
Description: 4th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 6

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Oct 1964
Last Scheduled:
9 Jun 1959


Prime
Crew

⇑ Mission List ⇑

Designation: Horizon 1 O-CA-1-2
Description: 2nd Horizon Saturn I manned support orbital of 1st assembled cargo lunar landing

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

Horizon 7

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
12 Oct 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-5
Description: 5th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 8

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn II
Scheduled Launch:
22 Oct 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 2 O-CA(U)-1-1
Description: 1st Horizon Saturn II unmanned orbital for 1st assembled cargo lunar landing

Horizon 9

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Nov 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-6
Description: 6th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 10

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
11 Nov 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-7
Description: 7th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 11

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
21 Nov 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-8
Description: 8th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 12

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Dec 1964
Last Scheduled:
9 Jun 1959


Prime
Crew

⇑ Mission List ⇑

Designation: Horizon 1 O-CA-1-3
Description: 3rd Horizon Saturn I manned support orbital of 1st assembled cargo lunar landing

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

not assigned

Horizon 13

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
9 Dec 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-9
Description: 9th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 14

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
16 Dec 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-10
Description: 10th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 15

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
24 Dec 1964
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-11
Description: 11th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 16

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
1 Jan 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-12
Description: 12th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 17

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
6 Jan 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-13
Description: 13th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 18

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
11 Jan 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-14
Description: 14th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 19

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
16 Jan 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-CA(U)-1-15
Description: 15th Horizon Saturn I unmanned orbital for 1st assembled cargo lunar landing

Horizon 20

Spacecraft:
(no serial number)
Launch Vehicle:
Saturn I
Scheduled Launch:
22 Jan 1965
Last Scheduled:
9 Jun 1959

⇑ Mission List ⇑

Designation: Horizon 1 O-EV(U)-1
Description: 1st Horizon Saturn I unmanned emergency vehicle orbital

Horizon was a 1959 US Army study to establish a military lunar outpost. According to the project plan, by the end of 1964, a total of 40 Saturn vehicles would have been launched to assemble the necessary spacecraft and infrastructure in low earth orbit. Cargo delivery to the moon would begin in January 1965 with the first manned landing by two men in April 1965. The build-up and construction phase continued until the outpost would be manned by a task force of 12 men in November 1966.

This build-up program required 61 Saturn I (not to be confused with the Saturn C-1, which was later redesignated as the Saturn I) and 88 Saturn II launchings through November 1966. Some 490,000 pounds of useful cargo would be transported to the moon. During 1967, the first operational year of the lunar outpost, a total of 64 launchings were scheduled, resulting in an additional 266,000 pounds of cargo on the moon. The total cost of the eight and one-half year program presented in the study was estimated to be six billion dollars.

Soon after the Horizon study was completed, NASA was formed and assigned all space exploration tasks. The Von Braun team that led Horizon were transferred to NASA. The origins of the Apollo project can be seen in Horizon.

The Horizon Orbital Return Vehicle was envisioned to carry 10 to 16 men.

References:
Encyclopedia Astronautica.
Wikipedia.