Apollo Saturn 110

Spacecraft:
(no serial number)
Launch Vehicle:
3-stage Saturn C-1 Blk 2 SA-115
Scheduled Launch:
1 Oct 1964
Last Scheduled:
15 May 1961


Prime
Crew

⇑ Mission List ⇑

Designation: Apollo S1-3 L C1-1
Description: 1st Apollo 3-stage Saturn C-1 manned CSM Blk I orbital

not assigned

not assigned

not assigned
Backup
Crew

not assigned

not assigned

not assigned

On 15 May 1961 General Electric's Missile and Space Vehicle Department (MSVD) delivered the report of a feasibility study under contract to NASA. MSVD's proposed Apollo program schedule included a three-stage Saturn C-1 manned CSM orbital flight in October 1964. NASA announced the redesign of the Saturn C-1 as a two-stage launch vehicle on 1 June 1961.

References:
Arthur, G. R. and Bloom, H. L. 1961. "Final Report, Volume IX: Apollo Implementation Plan." General Electric Missile and Space Vehicle Department. 15 May. NTRS-1974073801.
Encyclopedia Astronautica.
Wikipedia.


M S Carpenter



L G Cooper



J H Glenn



V I Grissom



W M Schirra



A B Shepard



D K Slayton