Apollo Saturn 111

Spacecraft:
(no serial number)
Launch Vehicle:
3-stage Saturn C-1 Blk 2 SA-116
Scheduled Launch:
1 Dec 1964
Last Scheduled:
15 May 1961

⇑ Mission List ⇑

Designation: Apollo S1-3 L AE(U)-1
Description: 1st Apollo 3-stage Saturn C-1 unmanned CSM high elliptical orbital

On 15 May 1961 General Electric's Missile and Space Vehicle Department (MSVD) delivered the report of a feasibility study under contract to NASA. MSVD's proposed Apollo program schedule included a Apollo 3-stage Saturn C-1 unmanned CSM high elliptical orbital flight in December 1964. NASA announced the redesign of the Saturn C-1 as a two-stage launch vehicle on 1 June 1961.

References:
Arthur, G. R. and Bloom, H. L. 1961. "Final Report, Volume IX: Apollo Implementation Plan." General Electric Missile and Space Vehicle Department. 15 May. NTRS-1974073801.
Encyclopedia Astronautica.
Wikipedia.